Open Road Tolling Conversion
Chicago, Illinois

ORd

The Illinois Tollway, as part of their Congestion Relief Program (CRP), initiated an aggressive plan to convert all mainline plazas on their system to Open Road Tolling within about a 20 month period. This created a shortened design period (of about 6-9 months including Master Planning) an a construction period of less than a year on most plazas.  This was accomplished with a concentrated effort of all stakeholders from the owner to the engineering and construction communities.

CMT was one of the prime consultants selected to lead the design efforts of six plazas for Master Planning and two plazas for design. Our team consisted of six other subconsultants and included the widening and reconstruction of five bridges as well as the removal and replacement of concrete pavements, shoulders and appurtenances.

CMT provided Phase II engineering services for the preparation of contract plans and specifications and all project related permits for the proposed Open Road Toll Plaza conversions at two mainline toll plazas on the Northwest Tollway at M.P.1.7. Plaza 1 (Devon) and M.P.0.6. (River Road) in Cook County, Illinois.

Projects

Rockford, IL
New Morgan Street
Bridge

Indianapolis, IN
Georgia Street
Improvements

Chicago, IL
Open Road
Tolling Conversion

Jefferson City, MO
Parclo Interchanges
with Roundabouts

Chicago, IL
I-355 South Tollway
Extension

Arnold, MO
Modified Single Point
Urban Interchange

LaSalle, IL
Shippingsport Bridge
Replacement

Chicago, IL
Adams Street
Viaduct

Metro St. Louis, MO
Route 367 Freeway
Conversion

Indianapolis, IN
South White River
Greenway Trail

Wayne County, IN
U.S. Route 40
Rehabilitation