In this Current article, CMT’s Rick Huber shares the story of the construction of the $230 million Lower Meramec Wastewater Treatment Facility (LMWTF) and the unprecedented size of the large pump station. See the article on page 11.
In this Current article, CMT’s Rick Huber shares the story of the construction of the $230 million Lower Meramec Wastewater Treatment Facility (LMWTF) and the unprecedented size of the large pump station. See the article on page 11.