Results:
Lake Springfield Vision & Master Plan
April 11, 2024 — Lake Springfield Vision & Master Plan City of Springfield, MO Lake Springfield was identified...Jefferson County Bicycle & Pedestrian Masterplan
April 11, 2024 — Jefferson County Bicycle & Pedestrian Masterplan Jefferson County (MO) Department of Public...Jim Box, MCSE
March 4, 2024 —GIS Specialist
20th Street Mobility Improvements
December 20, 2023 —Mobility Improvements
Southwest Chief Passenger Rail Corridor Study
December 5, 2023 —Southwest Chief Passenger Rail Corridor Study
Optimized Cost and Innovation in Wet Weather Storage Tank
October 19, 2023 — Aerial of sanitary storage facility Construction of sanitary storage facility aerial shot of...Tom Morris, PE, ENV SP
September 15, 2023 —Aviation Project Manager
A 10-Day Triumph for Commercial Air Service
September 11, 2023 — Main Street and Market Street Roundabout Main Street and Market Street Roundabout Aerial WIDE Main...Improving Traffic Flow and Safety Along Glenstone and US 60
August 30, 2023 — Improving Traffic Flow and Safety Along Glenstone Avenue and US 60 US 60 & Glenstone...Improving Connectivity With a Tight Diamond Interchange
August 24, 2023 — David Hoekel Parkway at I-70 complete Improving Connectivity With a Tight Diamond Interchange...Enhancing Safety Along a High-Crash Corridor
August 21, 2023 — I-57 and IL Route 13 Single-Point Intersection Aerial WIDE I-57 and IL Route 13 Single-Point...Allen Smith, PE, SE
March 30, 2023 —Structural Project Engineer for Surface Transportation
Jared Wigger, PE
March 24, 2023 —Senior Structural Engineer
Merchants Bridge Main Span Trusses & East Approach Construction
March 7, 2023 —Span Truss
MacArthur Bridge Broadway Truss Replacement Design & Construction
March 7, 2023 —Rail Bridge Design
Matt DeMoss, PE
March 1, 2023 —Rail Safety Lead
Springfield Underground Transload Facility
February 24, 2023 — Springfield Underground Transload Facility The Erlen Group | Springfield, MO Springfield...Raed Armouti, PE
December 16, 2022 —Senior Vice President and Director of Water Resources*
Ty Sander, PE
July 16, 2022 —Senior Vice President and Aviation Group Manager, Missouri*
2021 USDOT RAISE Grant Awardee: West Florissant Avenue Great Streets Project
July 11, 2022 — Centering Funding to Drive Implementation St. Louis County DOTCities of Dellwood and Ferguson, MO...Stephen Prange, PE
May 31, 2022 —Senior Vice President, Business Development & Strategy Director, and Rail Services Leader*
Stratmann Pump Station
December 14, 2021 — Design-Build Stratmann Pump Station Replacement MISSOURI AMERICAN WATER – ST. LOUIS, MO...US Hwy 60 & BNSF Corridor Study
December 13, 2021 — US Hwy 60 & BNSF Corridor Study Connecting Clients to Tools That Facilitate Change US Hwy 60 &...At-Grade BNSF Rail Crossing Safety Study
December 9, 2021 — BNSF Rail Car Performance Metrics That Drive Investment At-Grade BNSF Rail Crossing Safety Study...I-44 Bridge Mussel Habitat Survey
April 29, 2021 — Mussel Habitat Survey for Bridge Replacement on the Spring River I-44 Bridge Mussel Habitat Survey...Taxiway K Reconstruction
March 9, 2021 — Busy Taxiway Reconstruction While Fully Operational Taxiway K Reconstruction St. Louis Lambert...Jack Blakemore, PE
March 4, 2021 —Edwardsville, IL Office Manager and Project Manager/Engineer
Brian Eads, PE, PTOE
February 17, 2021 —Director & Traffic Practice Lead*
Award-Winning Comprehensive Plan Update for Fast-Growing City
November 9, 2020 — Award-Winning Comprehensive Plan Update for Fast-Growing City Marshfield Community Growth Plan...Daniel Meckes, PE
August 16, 2020 —Principal/Advisor
I-44 Interchange Improvements
May 6, 2019 — Marshfield MO Interchange with Roundabouts Aerial Drone Image Marshfield MO Interchange with...Grand Street Bridge Over Jordan Creek, Kansas Expressway to Park Avenue
May 6, 2019 — Grand Street Bridge Over Jordan Creek Grand Street Bridge Aerial Grand Street Bridge Under...Design-Build Bridges
May 6, 2019 — Design Build Bridges I-44 Logo Design-Build Bridges I-44 Map Fast-Track Design-Build Bridge...R. Jay Rakers, PE
February 8, 2019 —Surface Transportation Project Manager
Lee’s Summit Airport Runway 18-36 Expansion and Related Improvements
May 31, 2018 — Lee's Summit Runway Completed Aerial Lee's Summit Runway Completed Lee's Summit Airport Runway...Julie Jenson, PE
February 1, 2018 —Water Resources Group Manager & Office Manager, Kansas City, MO
Scott Hanson, MPA, MSP, AICP
January 23, 2018 —Senior Urban & Regional Planner
West Florissant Avenue Great Street Project
August 31, 2017 — West Florissant Avenue Full Corridor Axon Rendering West Florissant Complete Street Rendering from...Mississippi River Bridge and I-70 Interchange and Corridor
August 25, 2017 — Mississippi River Bridge and I-70 Interchange Finished South View Mississippi River Bridge and...Fifth Street Gateway Streetscape
August 25, 2017 — Fifth Street Streetscape Intersection Aerial 3 Fifth Street Streetscape, Sidewalk, Landscaping and...Historic Downtown Master Plan and Revitalization
August 24, 2017 — Branson Streetscape Fountain Branson, MO Liberty Plaza Completed 3 Branson, MO Liberty Plaza...Design-Build Wastewater Treatment Facilities
August 8, 2017 — Liberty WWTP Clarifier Liberty Wastewater Treatment Plant Construction Liberty Wastewater...Runway 12R-30L Rehabilitation
August 8, 2017 — St. Louis Lambert International Airport Terminal Aerial St. Louis Lambert International Airport...US Customs and Border Protection (CBP) General Aviation Facility (GAF)
June 29, 2017 — Springfield-Branson International Airport General Aviation Facility Interior Springfield-Branson...I-70 and Route MM Interchange
April 11, 2017 — Warrenton Interchange Roundabouts Aerial Roundabout with Landscaping Aerial I-70 and Route MM...Lane Additions of I-64 in Missouri
April 4, 2017 — I-64 Widening 4 I-64 Widening Under Construction I-64 Widening 6 Green Stormwater Approach on...Cloud Based Water System Mapping and Geographic Information Systems (GIS)
April 4, 2017 — Aurora Water Mapping Assets MAP Mapping Water System Assets Cloud Based Water System Mapping and...New Interchange at US 50/63 and East McCarty Street; Civil and Site for Commercial Development
April 4, 2017 — US 50 and City View Interchange Aerial US 50 and City View Interchange Improvement Map US 50 and...Route 367 Freeway Conversion Construction Inspection
April 3, 2017 — Route 367 Freeway Conversion Aerial 2 Route 367 Freeway Conversion Aerial Route 367 Freeway...New General Aviation Complex
March 31, 2017 — Tee-Town, A General Aviation Revitalization New General Aviation Complex Charles B. Wheeler...Master Plan and Expansion
March 17, 2017 — Waynesville/St. Robert Regional Airport at Forney Field with Tower Waynesville/St. Robert Regional...Scott Knight, PE
March 9, 2017 —Water Resources Group Manager, St. Louis, MO
Kevin Fuller, PE
February 16, 2017 —Vice President, Surface Transportation Group and St. Louis, MO Office Manager