
Results:


Improving Connectivity With a Tight Diamond Interchange
August 24, 2023 — David Hoekel Parkway at I-70 complete Improving Connectivity With a Tight Diamond Interchange...
Enhancing Safety Along a High-Crash Corridor
August 21, 2023 — I-57 and IL Route 13 Single-Point Intersection Aerial WIDE I-57 and IL Route 13 Single-Point...
Transforming Urban Mobility and Safety in a Growing Downtown
August 11, 2023 — Main Street and Market Street Roundabout Main Street and Market Street Roundabout Aerial WIDE Main...
One of the First Double Median U-Turn Intersections (MUT) in Florida
November 19, 2021 — One of the First Double Median U-Turn Intersections (MUTs) in Florida SR 212 (Beach Boulevard)...
I-70 Rehabilitation, East of Indianapolis
April 15, 2021 — Traffic Maintenance Critical on Miles of Interstate I-70 Rehabilitation, East of Indianapolis...
SR 46 and SR 11 Interchange and Railroad Overpass of the L&I Railroad and SR 11
April 14, 2021 — Enhancing Safety and Increasing Capacity Along Corridor SR 46 and SR 11 Interchange and Railroad...
Long-Term Municipal Consulting
November 13, 2020 — Consulting Engineering for a Coastal City Long-Term Municipal Consulting City of Palm Coast, FL...
As-Needed Municipal Engineering Consulting
November 13, 2020 — There When You Need Us As-Needed Municipal Engineering Consulting City of St. Augustine Beach, FL...
11th Street Extension
May 29, 2019 — 11th Street Extension 1 11th Street Extension 3 Twenty-five Years of Work Results in Vital...
I-44 Interchange Improvements
May 6, 2019 — Marshfield MO Interchange with Roundabouts Aerial Drone Image Marshfield MO Interchange with...
Grand Street Bridge Over Jordan Creek, Kansas Expressway to Park Avenue
May 6, 2019 — Grand Street Bridge Over Jordan Creek Grand Street Bridge Aerial Grand Street Bridge Under...
Jackson Street Corridor and Streetscape
May 6, 2019 — Jackson Street Corridor Permeable Pavers Aerial Jackson Street Drain Pipes Jackson Street Corridor...
Design-Build Bridges
May 6, 2019 — Design Build Bridges I-44 Logo Design-Build Bridges I-44 Map Fast-Track Design-Build Bridge...
Arterial Street Reconstruction – University Street and Forrest Hill Avenue
August 7, 2018 — University Street and Forrest Hill Avenue with Sign University Street and Forrest Hill Avenue with...
Bike Lane/Shared Lane Delineation
August 7, 2018 — Springboro, OH Bike and Shared Lane with Sign Springboro, OH Bike and Shared Lane with Directional...
Jamaica Road Resurfacing
August 7, 2018 — Jamaica Road Resurfacing Jamaica Road Resurfacing 1 Jamaica Road Resurfacing 1 Jamaica Road...
Relocation of Election House Road
August 7, 2018 — Relocation of Election House Road Relocation of Election House Road 2 Road Relocation Enhances...
Miller Ecological Park Assessment and Management
February 20, 2018 —Miller Ecological Park Assessment and Management

West Florissant Avenue Great Street Project
August 31, 2017 — West Florissant Avenue Full Corridor Axon Rendering West Florissant Complete Street Rendering from...
Mississippi River Bridge and I-70 Interchange and Corridor
August 25, 2017 — Mississippi River Bridge and I-70 Interchange Finished South View Mississippi River Bridge and...
Fifth Street Gateway Streetscape
August 25, 2017 — Fifth Street Streetscape Intersection Aerial 3 Fifth Street Streetscape, Sidewalk, Landscaping and...
Pedestrian Bridge for Park-n-Ride
August 25, 2017 — PACE Pedestrian Park-n-Ride Bridge Aerial PACE Pedestrian Bridge Aerial Completed Pedestrian...
Historic Downtown Master Plan and Revitalization
August 24, 2017 — Branson Streetscape Fountain Branson, MO Liberty Plaza Completed 3 Branson, MO Liberty Plaza...
Georgia Street Improvements
August 24, 2017 — Georgia Street Improvements Georgia Street Improvements at Night Georgia Street Improvements...
Sign Upgrades
August 11, 2017 — ODOT Sign Asset Management 2 ODOT Sign Asset Management SIGNS Asset Management for Highway Signage...
Illinois Tollway Converting Mainline Plazas to Open Road Tolling
August 8, 2017 — Tolling Station Aerial 2 Tolling Station Aerial 4 Tolling Station Aerial 3 Tolling Station Aerial...
Practical Design and Value Engineering Workshops for I-69 Extension
August 4, 2017 — Practical Design and Value Engineering Workshops for I-69 Extension Facilitating Consensus Toward...
Greencastle, IN Downtown Revitalization
July 13, 2017 — Greencastle Downtown Revitalization Sidewalk Greencastle Stellar Streetscape Intersection...
The Villas Downtown
June 23, 2017 — New Student Housing Downtown Streetscape New Student Housing Downtown Streetscape 2 New Student...
I-70 and Route MM Interchange
April 11, 2017 — Warrenton Interchange Roundabouts Aerial Roundabout with Landscaping Aerial I-70 and Route MM...
Lane Additions of I-64 in Missouri
April 4, 2017 — I-64 Widening 4 I-64 Widening Under Construction I-64 Widening 6 Green Stormwater Approach on...
New Interchange at US 50/63 and East McCarty Street; Civil and Site for Commercial Development
April 4, 2017 — US 50 and City View Interchange Aerial US 50 and City View Interchange Improvement Map US 50 and...
Route 367 Freeway Conversion Construction Inspection
April 3, 2017 — Route 367 Freeway Conversion Aerial 2 Route 367 Freeway Conversion Aerial Route 367 Freeway...
Reconstruction of the Adams Street Bridge Over the Union Station Tracks and Chicago River
April 3, 2017 — Adams Street Bridge Finished with Boat Under Adams Street Bridge Before Construction Adams Street...
South White River Greenways
February 15, 2017 — White River Greenway Trail White River Greenway Trail White River Greenway Trail White River...
North-South Tollway (I-355) South Extension, I-55 to 127th Street
February 8, 2017 — North-South Tollway (I-355) South Extension Aerial North-South Tollway (I-355) South Extension 3...
National Avenue & Republic Road Intersection
February 8, 2017 — Republic and National Intersection Republic & National Intersection 2 Republic Road Church at...
US Highway 160 Over Howell Creek & BNSF Railroad
February 8, 2017 — West Plains US 160 Seperation Over Railroad Bridging a Divide US Highway 160 Over Howell Creek...
I-65 and Worthsville Road Diverging Diamond Interchange
February 8, 2017 — Worthsville Interchange Current Aerial Worthsville Road Double Diamond Interchange Worthsville...
Plank Road Realignment
February 8, 2017 — Kane County Realignment of Plank Road Aerial 2 Kane County Realignment of Plank Road 2 Kane County...
New Morgan Street Bridge and Corridor
December 13, 2016 — Morgan Street Bridge at Night Morgan Street Bridge Completed URBAN 2 Morgan Street Roundabout...
I-57 & IL Route 13 Single-Point Interchange
December 13, 2016 — I-57 and IL Route 13 Single-Point Intersection Aerial WIDE I-57 and IL Route 13 Single-Point...
Longmeadow Parkway Improvements, Section C
December 13, 2016 — Millions in Savings on Corridor Improvements Longmeadow Parkway Improvements, Section C Kane...
Illinois Route 29 Expressway Extension
December 13, 2016 — Grassroots Call for Safety Illinois Route 29 Expressway Extension Illinois Department of...
I-270 Chain of Rocks Canal Bridge Replacement Project Construction Phase Services
December 13, 2016 — I-270 Chain of Rocks Canal Bridge Replacement Finished Aerial I-270 Chain of Rocks Canal Bridge...
Barrington Road Interchange at the Jane Addams Memorial Tollway (I-90)
December 13, 2016 — I-90 and Barrington Interchange Aerial Nelson and Cole with Award Barrington Interchange with...
Hague Avenue Improvements
December 13, 2016 — Hague Avenue in Columbus Aerial Hague Avenue Demonstration of Porous Pavement Demonstration of...
I-57 and I-74 Interchange Reconstruction
December 13, 2016 — I-57 and I-74 Interchange Reconstruction Map Interstate to Interstate Interchange Redesign I-57...
Park Stormwater Improvements and Flood Control
December 9, 2016 — Fassnight Park Completed Fassnight Park Completed Fassnight Park Grant Avenue Bridge Completed...